Electric metering with the XTender
The seed or fertiliser is metered by the electrically-driven metering unit underneath the seed hopper. Since the metering system is located right at the front under the hopper, it is easy to reach and enables quick and easy exchange of the metering cassettes - different metering cassettes are available for various seed types and fertilisers. The electrically driven metering system enables easy adjustment of the seed rate from the tractor cab, pre-metering in field corners and calibration at the touch of a button. Alternatively, the metering can be controlled fully automatically by application maps.